Mortar Mix Types M, S, N, O, K

Mortar is a mix of cement+water+ sand +lime. It's used for bricks or blocks building. 5 types of cement mortar are commonly used in construction work.

Type M mortar : high Compressive Strength mix. It's recommend for high compression loads. Type M mortar consist of the following quantities properties ( by volume) 1portland cement+ 1/4 lime +3.5 sand.

Type S mortar:  high bond strength mortar. It's recommend for structures subjects to lateral loads or below grade retaining walls. Type S mortar is made by ( properties by volume): 1portland cement+ 1/2 lime+ 4.5 sand 

Type N mortar:  it's the general purpose mortar multiple usage in construction work for most of constructions. The components of type N mortar 1 Portland Cement+ 1 lime + 6 sand ( properties by volume).

Type O mortar:  high lime low compressive strength. Common uses in non load bearing structures. Type O mortar consist of 1portland cement + 2 lime+ 9 sand ( properties by volume).

Type K mortar: very low compressive strength. It's seldom used in new construction work, it's used mainly for repair of historical building. Type K mortar consist of 1 Portland Cement+ 3 lime+ 12 sand ( properties by volume).

Summary: as a general, for construction above ground use type N mortar or type O mortar when non load bearing structures.  For below grade construction use type M mortar or type type S mortar when lateral loads are found.
Brick walls in concrete building



Comments

Popular posts from this blog

KEYSTONE RETAINING WALL

 Introduction:- Keystone is a mechanical stabilized earth wall MSEW which used to retain soil from one side, it's less cost than concrete walls. Material  1-Keystone Blocks 2-Fiberglass Pins 3-Geo-grids 4- Back-filling Material 5-Concrete pad  Different type of Geogrid:  TT045 can carry load till 45KN/m. TT060 can carry load till. 60KN/m. TT090 can carry load till 90KN/m.  TT120 can carry load till 120KN/m.  TT160 can carry load till. 160KN/m. Method Statement  1) Place HDPE Geogrids on top of the compacted soil. HDPE Geogrids are installed from the front on top of the fiber glass pins (which penetrates the grid) and from to back, Geogrids are fixed horizontally using a steel bars.  2) Lay down the precast concrete units on top of a PC foundation at a level that is a Minimum of 5% from the wall height and reach 10% (buried height) to prevent any lateral movement .  3) Put the layers of Geotextile.  4) Backfilling using fine gravel b...

Differences between development length, anchorage length and splice length

  1-Development length Ld It is the minimum length of a reinforcing bar that must be embedded or "developed" in concrete to ensure that the bar can achieve its full strength in tension or compression. 2-Anchorage length La The distance that the reinforcement extends from the point where the bars are no longer required to resist moments 3-Splice length LS The distance require to transfer the force from bar to another one to upload full presentation please download this  https://drive.google.com/file/d/1layyDvTlJOLzo3jfoW4K5O5UEkgoEzgN/view?usp=sharing

Edge Distance for Bolts as per Egyptian Code

Bolt grades Bolt Grade 4.6 4.8 5.6 5.8 6.8 8.8 10.9 Fy t/cm2 2.4 3.2 3.0 4.0 4.8 6.4 9 Fu t/cm2 4.0 4.0 5.0 5.0 6.0 8.0 10.0   Ordinary Bolts High strength bolts *Revit have two grades:   grade 1    Fu 5t/cm2, grade2 Fu 6t/cm2 e1= end distance                                                                                ...