1-Development length Ld It is the minimum length of a reinforcing bar that must be embedded or "developed" in concrete to ensure that the bar can achieve its full strength in tension or compression. 2-Anchorage length La The distance that the reinforcement extends from the point where the bars are no longer required to resist moments 3-Splice length LS The distance require to transfer the force from bar to another one to upload full presentation please download this https://drive.google.com/file/d/1layyDvTlJOLzo3jfoW4K5O5UEkgoEzgN/view?usp=sharing
Deliverables progressive elaboration timeline from busine case up to customer/ sponsor final delivery as per PMI PMBOK6th edition 1-Business case necessary information from a business standpoint 2-project charter High level project description, Key deliverables, 3-Collect Requirements 1. Requirements documentation 2. Requirements traceability matrix 4-Define Scope Project scope statement Product scope description Deliverables 5-Create WBS Scope baseline• Project scope statement WBS Work package Planning package WBS dictionary 6-Define Activities 1. Activity list 2. Activity attributes 7-Direct and Manage Project Work Deliverables 8-Control Quality Verified Deliverables 9-Validate Scope Accepted Deliverables 10-Close Project or Phase Final product, service, or result transition to sponsor